RELIGIOUS PROJECTS
Brookwood Baptist Church, Shreveport, LA
Temple Baptist Church Renovation, Ruston, LA
Green Acres Baptist Church, Tyler, TX
• Student Center
• Education Building
First Baptist Church Midlothian, Midlothian, TX
Mobberly Baptist Church Student Center, Longview, TX
St. Joseph Catholic Church, Shreveport, LA
Broadmoor Baptist Church, Shreveport, LA |
 |
| Brookwood Baptist Church, Shreveport, LA |
| Size: 72,000sf (Phase I: 60,000sf / Phase II: 12,000sf) |
| Construction Cost: $7.3 million |
| Discipline: Structural |
| Owner: Brookwood Baptist Church |
| |
| The church includes an innovative tilt-up concrete structural system with long span structural steel trusses framing sanctuary. The precast and structural steel bell tower is designed for future vertical expansion. |
|
|
 |
|
 |
| Temple Baptist Church Renovation, Ruston, LA |
| Size: 156,000sf |
| Construction Cost: $12 million |
| Discipline: Structural |
| Owner: Temple Baptist Church |
| |
| The new church includes a 1,400-seat colonial design sanctuary featuring gallery and balcony seating; two-story education wing connecting to both levels of the sanctuary; administrative offices, kitchen areas and library; 27,000 square foot two-story family life center with gymnasium, racquetball court, game room, physical fitness space and snack area; and a 3,365 square foot chapel for more intimate gatherings. |
|
|
 |
|
 |
| Green Acres Baptist Church Student Center, Tyler, TX |
| Size: 11,250sf |
| Construction Cost: $1.4 million |
| Discipline: Mechanical, Electrical & Plumbing |
| Owner: Green Acres Baptist Church |
| |
| The 11,250 square foot project includes a new student center meeting room with gathering area, outdoor basketball and sand volleyball courts. |
|
|
 |
|
 |
| Green Acres Baptist Church Education Building, Tyler, TX |
| Size: 100,440sf |
| Construction Cost: $13.2 million |
| Discipline: Mechanical, Electrical & Plumbing |
| Owner: Green Acres Baptist Church |
| |
| This new three-story education building includes children’s space courtyard playground, administrative office space and adult classroom/gathering area. The design includes new chilled water and boiler HVAC system, water and waste water plumbing, fire suppression system, lighting, power and fire alarm systems. |
|
|
 |
|
 |
| First Baptist Church Midlothian, Midlothian, TX |
| Size: 20,400sf |
| Construction Cost: $4 million |
| Discipline: Structural, Mechanical & Electrical |
| Owner: First Baptist Church Midlothian |
| |
| The project consists of a two-story education classroom addition, 210-seat chapel addition and modifications to existing spaces. Also included were DX HVAC systems, water and waste water plumbing, lighting, power, fire alarm and coordination/integration of audio/video/lighting systems. The structural engineering includes design for foundation, second floor and roof framing systems. |
|
|
 |
|
 |
| Mobberly Baptist Church Student Center, Longview, TX |
| Size: 20,640sf |
| Construction Cost: $1.8 million |
| Discipline: Mechanical & Electrical |
| Owner: Mobberly Baptist Church |
| |
| A new youth assembly area with kitchen, café area, video game and lounge area, breakout rooms, large group meeting room and outdoor covered basketball court. Engineering services include HVAC systems, plumbing, lighting, power, fire alarm, kitchen equipment utilities coordination, and sound system coordination. |
|
|
 |
|
| |
|